Sunday, July 7, 2024

 Renovating the GWR Hand Crane

This artefact was rescued from the former Goods Shed at Usk Station in Wales.

It is operable, just, but the main chain wheel shaft is slightly bent, some thing we hope to

sort out shortly.

A thorough clean is underway,


and spot rust removal, before re painting.



Wednesday, June 19, 2024

 After many months, the restoration of Morris Commercial LC4

is underway again with the fine weather.

Sprayed the Bonnet panels with two pack acrylic paint, got a brilliant sine but a few Summer bugs landed on the paint before it had cured, they will be no problem to nib out later




.


Wednesday, June 12, 2024

 After a Wednesday off the 12Th  of June was a dry day iith a cool start but ideal for working outside.



It started off with tackling mother nature again as the brambles had entered the Foss Cross building and were getting around the Exhibits a quick look behind and the problem was obvious.

                                             


So a session with the hedge trimmer and secateurs wearing thick gloves got it sorted.

                                          


Greg is sorting the Morris bonnets out after extensive rust removal and treatment they are now in primer.

                                                  


Rob King the onsite book and railwayana sales man had donated a 1950 cardboard model railway kit that was part built, The printing on the assembled item had faded with uv but a light spray of watered down yellow with the airbrush has restored the colours.


It was then a drive to Hayles Abbey Halt to continue work on the Shelter the view on arrival a usty roof



Whilst there it looks like somebody has removed the plate from the rear of the bench seat so further investigation required.

First job was clean around the holes where rot had set in then fill them with lead using a blow torch and pieces of the pathway stone underneath to stop it dripping through.


adding the lead

The repaired holes mean this inside will remain dry over the seating area.



The roof was treated to a coat of aqua seal from a tin that somebody had thrown into a skip a while ago



Back to Toddington and the crane on the dock requires attention as it is corroding and stained with years of being stood untouched.





Plenty more tidying for the future.



Wednesday, May 29, 2024

 Wednesday 29th May a dry warm day so outside it is.


                           Some old brackets needed derusting and painting with primer



The cast iron plate in Taylors office has started to show surface rust so a wire brush then a paint with lanolin and graphite powder mix.



Mother nature has been wet and warm so the green vegetation is taking over so to keep the area looking well used time for some weeding and sweeping up.


                               The trees have been busy shedding seeds to add to the mess



The Scammell has been receiving some TLC standing outside all the time with the steam engines going past has made it look untidy.


indicators off for a good clean and repaint


The cream paint has been redone inside and out


the brass vacuum connection has started getting stripped for polishing


                 Betton Grange one of the engines brought in for the steam gala came past



It was then a drive to Halles Abbey halt to de rust the roof and get the loose bitumen off ready for a repaint but time was against us along with batteries going flat on the tools.

                                                                before

                                                                       After


                                                          Another photo opportunity


Wednesday, May 22, 2024

 After a week off the 22nd of May 2024 turned out to be a day of heavy rain so inside work.


Greg has some wood trims and a notice board from the carriage at Long Marston these needed stripping of paint and varnish then rubbing down to smooth them.  Palm scrapers were used to remove the paint and varnish.



the long lengths go above the doors and windows.


after the scraping we are left with the wood with a few specks of paint in the deeper grain which will show when varnished so after this a good sanding was in order.

the sign board edges were next for the treatment.

We had a steam whistle left in the workshop by persons unknown so a quick clean up was needed then Greg was approaching the Steam Shed crew to see if they could identify it.



The Honeybourne signal box displays needed a good clean as the bats are now active and adding to the mess in there after last years extensive clean.

But first a blocked drain needed attending to so dry foot access will be possible the traction engines and trailers parked there ready for the gala weekend hampered access.



Then it was glass cleaning and shelf polishing


The Wendy House needed a good cleaning of the roof to reveal the tiling pattern.
one side done



                                                                    Both sides done

A large collection of dried oak leaves and debris was removed from where a mouse had decided to build a nest on a shelf above the office bench.

By the time we finished the puddle outside had not gone down as the rain was adding to it faster than the drain could take it away.









.


 Wednesday 25th November 26                                        A cold dry day with some sun so ideal for outside work. The way into the ...