Wednesday 1st of July a lovely summers day after the heat wave and 3 weeks away.
Mother nature has been busy with plants growing and others failing in the heat so a sweep out of the buildings and some major plant growth removal the brambles have grown 4ft plus over the last 4 weeks.
The luggage racks from a passenger coach are in need of refurbishment they are hard wood poles with a metal rod holding the net into a slot secured by small wire staples which all needed to come out.
The 7 stripped racks most of the netting is unsalvageable and one pole is broken only the meatal rod was holding it together.
The poles were cleaned with a scraper then tidied up on the belt sander before a light coating of oil.
The Morris pickup floor had a small gap on one side so a plate has been put into the corner beneath it.
The BR -WR buried cable signs are getting there number 2 had deformed and in the heatwave it swelled up so much it was scrap so a fibreglass matting and resin one has been made in the mould.