James Taylor's Beckford Station, Coal office, to be saved
Happily, I have at last, had a result over the acquisition of James Taylor's former Beckford Coal, Brick and Tile office, approx 150 years old.
Heritage restoration work by the Restoration and Archiving Trust, based at Toddington, Gloucestershire.
James Taylor's Beckford Station, Coal office, to be saved
Happily, I have at last, had a result over the acquisition of James Taylor's former Beckford Coal, Brick and Tile office, approx 150 years old.
Keith mentioned in a previous post, the restoration of an O Gauge metal kit.
It was found in a bad way,and the original builder had obviously had difficulties in assembling it.
These metal kits are very hard to make, as they rely on parts being soldered together.
We did not know what to do with this model as attempts to give it a facelift ended up with parts falling off.
I gave it a blast off to remove poor paint and rebuilt the motions as they locked up when attempting to move the wheels.
To make a working model, I mounted the restored loco on a wooden base allowing it to run in situ.
I am pleased with the result as it now runs perfectly at the push of a button.
We can now trial it on display to see if it will be durable enough to withstand the attention of our visitors.
Restoration of the corridor connection of GWR Ocean Mails van.
After many years stripped of its identity, Andrew Goodman's Great Western parcel mails van, looks like it should be after replacing all the corridor end steps, roof rails and finally its missing corridor end connection.
The steps, handrails and suspension hanger for the corridor bellows were made from scratch by Ian Carpenter, who's talents are amongst the best in the land, the bellows frame, we bought from Tom Wright from the DMU group.
After remounting the frame, for expediency, we used a second hand canvass, which will have any damage repaired, in due course.
The Ocean mails were a service provided by the GWR, to speed on, mail from trans Atlantic Steam ship services arriving in the country.
The Liners would dock at Plymouth, Neyland or Fishguard, unload the mails on to express trains to London and other destinations arriving faster than if the ships continued on to their final destination Southampton.
The City Of Truro, locomotive set the Great western's rail speed record of 106 miles per hour on an Ocean Mails run.
We are proud to have taken this vehicle on a restoration thus far and hope to tackle a roof paint in the future.
Close inspection of this end of the PMV shows how it was, pre restoration
Getting there.
Monday the 18th a warmer than it should be dry day and my last before Christmas.
A quick look from the workshop across the Trusts exhibits that have been worked on over the last few years and then back into the workshop
Over the past week and a half the facia boards have misaligned so a quick realign and ad more screws
Then it was gutter bracket time and refit a clean gutter a quick test with the watering can proved it flowed away nicely.
Ian and the Heritage Team dug up a fire bucket hanger whilst at Broadway this need a good clean and repaint then fitting to an old fire bucket board we have in stock.
Nature is taking over the sign outside the Honeybourne signal box
The Signal box and Scammel from the visitor car park.
It was then Scammel time as it has been parked for six months plus so needed a full fuel drain to clean out the water and time on the battery charger, New fuel and 12 volts a quick sort out of the plug leads as the resistor caps have now gone and copper connections fitted so we have a good spark at last and we have a runner.
A terst drive failed as the righr rear brake was seized but the application of an hammer on the handbrake linkage freed it off so it was a drive around the yard for Greg
Wednesday the 13th and wet weather at Toddington so on advice from Greg on site the guttering install can wait a day or two as we would be working in the mud making more mess, Greg has some other work on and I am stuck awaiting a heavy parcel at 45Kgs from TNT/Fed Ex which I missed Tuesday as it did not show as in transit but sat at the warehouse. Monday is looking favourite for guttering, Scammel starting and Morris cab sealing before the bad weather sets in.
Wednesday the 6th December a bittier cold start the windscreen wanted to keep the ice on it so the deicer had to come out so I could get to the railway
Greg has been busy on the locomotive model it is now looking good and it actually works when connected to a power supply
Wednesday 29th July a cloudy start then the heatwave started. The Morris seat base needs another de rust and paint after stripping the...