Wednesday 14th October a lovely warmer than usual Autumn day and the sun is rising later.
Nature has been busy again dropping leaves so a quick tidy up.
Then it was time to get on with ivy removal so the final fence posts and wire anchor points could be accessed.
Once the staples were cut the stock wire fencing was removed, folded the best it can be and put in the skip we also decided to remove the original wires as they were rusty and any bending caused it to break.
Most of the old half round post are now out ivy stumps removed or cut off at ground level so now we need some original GWR wooden posts if we can source them along with a new role of wire so we can install a fence as GWR would have done in the day.
Mike has been busy in the new shed gluing down carpet tiles so it is ready for filling with books and photos that are in the archive office and house.
As the weather is warm and dry some more time on the museum mail coach body work is needed before the weather changes, the hot dry summer has caused shrinkage in some parts and expansion with other materials thus paint is peeling and screws are popping out. So a complete rubbing down with orbital sander and knock out any filler that has moved or cracked.
The West facing side has been sanded and painted so looking good above the waist line.
Greg is busy with the sign writers paint and brushes doing the yellow line, the brown needs some paint coloured to match so it can be patch painted rather than a full repaint.
And plenty left to do for another day.
.jpeg)

.jpeg)
.jpeg)
.jpeg)
.jpeg)
.jpeg)
.jpeg)

.jpeg)
.jpeg)
.jpeg)
.jpeg)
No comments:
Post a Comment