Wednesday, August 21, 2024

 Wednesday 21st August a dry partly sunny day with a cool start so outside it is.


Greg has been continuing with the GWR travel security box reassembly and it is looking good.


     It was then dock crane painting time the post and parts had been painted some more since last week.

                                                            the start of the day.

             


                  during painting and after it just leaves a few hard to access areas to finish off.



It was then Morris 2T 3cwt time the cab floor frame has been completed but needs more paint and preservation before the floor panel goes in.

                                             


the floor plate has been cut to shape with battery access hole, the panel was then marked above the members for drilling and securing.

                                                 


The seats were removed from the base frame so we could drop it into position and mark securing holes



















No comments:

Post a Comment

 Wednesday 9th October are dry warm start then the light rain came in. In the last week Greg has added more to the Hayles Abbey Sign and sta...