 The former Bishops Cleeve Lamp hut nears completion.

The rusted corrugated iron, at ground level has all been repaired with new,  the interior has been painted, lifting it up from the grim interior it had formerly.

Keith and I have been talking about repairing the rotten Lamp Bench and reinstating the side bench, so the hut is as it was, when made.

As it is in an operational area, it is not going to be available for public access, we tidied it up to give it a future and for it to add to the growing GWR Edwardian ambience.






Whilst working at Toddington Signal box, the temptation was too much,

I had to give the typical GWR electric cabinet a repaint.




 