 Cutting the doors to size

Most of the new floor in the Boxford waiting room is in place, not screwed down, that will happen after it has been in situ for a few weeks to allow for shrinkage.

The doors were too tall to fit with the new floor, so today they were reduced in size a the bottom.



The last photo shows the trimmed down doors back in place.