Wednesday 26th Feb 2025 a dry start that turned cold and wet.
More time on the draw cupboard, the draws were in the garden shed so have swollen with the damp air 2 fitted but the other 4 are now in the archiving office to dry out.
The cupboard has had a final sanding down before painting with cream undercoat.
When dry it will be wood grained paint finish
Time to sweep up of the leaves from the Autumn fall that had blown in so a clean out of Taylors office and the Pay office floors were a good starting point.
The glass counters and display cases have got a good dust covering so glass cleaner and a rag removed it.
The open fronted Foss Cross building got a visit with the leaf blower in suction mode to remove a decent pile of leaves and debris that had blown in.
A walk down to the line wagon always involves a look in the scrap skips, we find to 2T trolley jacks both working and one in very good condition although the handle was missing these were removed and put in our shop for £15 each to help raise funds.
The line wagon got the roof light painting completed and brown was applied to the end door after it had been filled.
As the rain had stopped it was possible to get the oil lamp cupboard out from Taylors office for a rub down and filling of damaged areas, it was then moved to the workshop to keep it dry and out of the publics eye until it is finished.
Another good day with progress made working down the long list of jobs.