Wednesday, November 9, 2022

Wed nov 9th

 Greg has been busy in the scammel doing both windscreen surrounds but the metal has gone thin in places making welding awkward even just trying to fill the odd hole




I have been removing old repairs from the Austin and cleaning  areas then applying a self etching or rust treatment primer then applying a coat of green just to seal the primes.




The final top glass was fitted to the AA box leaving just the 4 windows at the base of the signs to be done.
Greg made the last 1.25” of floor board so it met the closed door.
The electrical input cover was rotten so a new panel was made to cover the hole so no furry animals can get in.

4 pieces of glass to fit and a yale lock on the door it is just about finished then needs some internal period props put in.