Wednesday the 27th November a cold wet start so all inside stuff

Starting with a bench clean up so we have a work space then the floor around it



Continue with the gas lights,  the cover plates have been filled where the enamel was missing so a rub down and thin coat of white paint before starting reassembly which required a removal of the light tube packing we had put on.







then refit the "rocket tubes" but only one goes in past the corrosion the others with good metal have a smaller hole so will need trimming..


How they will look assembled but more work to do on the domes and brass.


Greg has removed the green felt from the display case and done it white background and put new shelves in so clean up the now set glue and fit the glass after removing the silicon.

the glass is held in with panel pins so after starting by hand with a block the clamps were used to gently ease them in


6 in and looking good but number 6 head was visible with the door closed so another gentle squeeze to get the last mm or two out of sight and the glass cracked as the panel pin head went closer so a disaster.



After that problem a walk down the line wagon to start the wiring install and light fittings also look at the door lock that is not holding


Wires up in the roof but the one section is about 12" to short so we have lamp 2 to 3 done and transformer to lamp 1

screw the heavy light up with two long screws so wiring can be joined then the light pushed up to fit the correct shorter domed brass screws,



in place and connected



It was then left door catch time another reprofile and it goes into the striker plate but rides up when pulled against.


it hooks onto the plate but rides up when pulled against so lock [late off and the plate is worn and sloping so an attack with the small grinding ball to even it out but it still does not hold so it looks like the striker plate will need to be raised a few mm so the force is higher up the catch hook.


































 

Wednesday, November 20, 2024

Wednesday 20th November 2024 After the snow fall yesterday followed by an overnight frost conditions outside mean interior work so a day on the lights, brush cleaning then a walk down to the line works carriage in the sidings.


                               The view from the workshop door and the Cotswold hills are white

                                        

A bit more work on converting and restoring the gas lights for the line van. refitting the brass screws after a quick polish then onto the dome bezels. 

                                                    A before and after initial clean

                                


                                                                Then a polish

                                                 


                                             All 3 are now getting near and looking a lot better.




Mean while Greg has discovered the paint brushes we need have gone hard and are even after sitting in the bucket of cleaner for a long while so a mass comb and clean task starts and dirty solutions are changed.
                                             


The old BR watering can now has a new bottom and holds water with no leakage it now needs a clean to remove the algae but not damage the galvanised finish.

            


The in was a walk down the line to the Wagon Teams 100 year old line workshop carriage.

First task was to get the left sliding door going full travel with no foul the top rail has already been raised a few mm,

                                           

 but the door stops half way, rotating the bar lifts the rear enough to clear so it runs smoothly so our reasoning is at 100 years old the bar has sagged with the weight on it so screws out turn and screw into it's new position

                     


                              The open view with covers off and the patchy roof paint

                                


                                         Now all back together and the freshly painted roof

                                     


After the adjustments the lock does not click shut to secure the door which is now a must as it freely slides. Closer investigation showed that the spring was weak and the catch was not dropping fully






The catch was stripped and a new spring fitted at the same time metal was removed from the frame to allow the catch to travel down further.



The outer handle ring was broken so this has been stripped and a new piece glued on the side ready for shaping when it is dry                                                                 

                                            

                                              Then it was home to get warm.

































Wednesday, November 13, 2024

 Wednesday 13th October 24 a murky start with fog and about average temp so the workshop fire got lit for the first time this season..

We had Malcomb a potential new member visit to see what we are about and do, so a conducted tour of our area and displays was done but it looks like he may decide to go into the archiving  side of our work not the practical tasks if he does which is useful as photographic donations turn up on a regular basis these need digitising onto the system and researching for date and location before the original is catalogued and stored

We got a C1930's GWR watering can given to us the GWSR were scrapping all in good condition but a rotten bottom so Greg cut the bottom out and made a new disc from a sheet of galvanised steel to lead solder into place.                                                                                                      .



The LED conversion to the Line Wagon interior gas lights continues alongside their restoration.

                                 How they started rusty and dirty with no glass domes.

                     


                             after a full strip rub down and repaint the bases look like this

                                         


The brass screws and fittings have been soaked in brass cleaner then washed off with water before a clean and refit, the bulb holder was a temporary fit to work out a way of securing them centrally before the base plate was fitted

                   


The base plates have been cleaned to see what the  condition the enamel was in under some brush painting, luckily not bad so the rough areas will be sprayed white with an airbrush before assembly

             


                The one nearest completion awaiting the brass ring to be polished but glass is fitted and the base plate can be refitted when painted



Then the most worrying task modifying the glass cake covers that were brought but needed the handles cutting off to make a hole in the bottom replicating the originals that had an hole in to let debris from the lamp fall out,  A diamond disc in a battery drill used under a trickle of water to cool it.

                                                              One down one to go


Then it was down the yard to the Lin rolling stock team who are doing up the parked line side display

                Last light mounting removed and the first restored one ready to be fitted this is were the LED converted gas lights will go.



We are having to rehang the sliding doors as they bind in use making access hard but more to fo;;ow on this next week..

Monday 30th December the fog has finally gone so a colder but clearer day. first job was de bag the pigeons and hang them on wires in the wi...